SAP Fiori Launchpad Activation via Task List (STC01)

Two good references:

http://help.sap.com/fiori_bs2013/helpdata/en/bf/d1b053a647e842e10000000a4450e5/frameset.htm
http://www.sapnwnewbie.com/2015/12/automating-frontend-configuration-of.html

Following are the task available on STC01 to perform Fronend setup:
  1. SAP_FIORI_LAUNCHPAD_INIT_SETUP - To activate launchpad OData and HTTP services on an SAP Gateway system (frontend)
  2. SAP_SAP2GATEWAY_TRUSTED_CONFIG - To create a trusted connection from an SAP system to SAP Gateway.
  3. SAP_GATEWAY_ADD_SYSTEM -  To connect an SAP system (backend) to an SAP Gateway system (frontend).
  4. SAP_GATEWAY_ADD_SYSTEM_ALIAS - To create a system alias for an existing remote function call destination (to backend).
  5. SAP_GATEWAY_ACTIVATE_ODATA_SERV - To activate multiple OData services. OData services are required to initially set up the SAP Fiori Launchpad and the SAP Fiori Launchpad designer.
  6. SAP_BASIS_ACTIVATE_ICF_NODES - To activate multiple HTTP Services (ICF). The SAP Fiori Launchpad uses the User interface add-on for SAP NetWeaver. It requires the ICF nodes that provide access to the web resources.
If you are using an Embedded Deplyment of Fiori, you can use the task SAP_GW_FIORI_ERP_ONE_CLNT_SETUP.

Comments

Popular posts from this blog

SAP Backdoors {placeholder Post]

Fiori Apps Keep Calling Internal Hostname / Internal FQDN